← Back to Blog Friday 13th of November 2026

Which Leeboy Buy Are You? A Scenario Guide for Graders, Parts, and the Small Stuff

Charlotte Avery
Charlotte Avery Charlotte Avery is an earth-moving machinery analyst covering excavators, mini excavators, loaders, skid steers, dozers, graders, compactors, and attachments. She uses ISO 6165 machine classification and ISO 20474-1 safety requirements while examining operating mass, rated payload, breakout force, ground pressure, stability, visibility, guarding, and attachment compatibility. Her work helps contractors and fleet buyers match machine size, undercarriage, transport limits, and protective features to terrain, duty cycle, and jobsite access.

"It depends" isn't the answer anyone wants, but after about five years of running purchasing for a 60-person roadwork company, I've stopped apologizing for it. I manage roughly $400,000 a year in orders across 12 vendors, and I report to both our operations director and our controller, which means I get to hear two completely different definitions of a "good decision" on the same afternoon.

The reason I won't just tell you to buy a Leeboy 695 motor grader is that the advice that's right for one contractor is genuinely wrong for another—not slightly off, but wrong in a way that costs six figures. So here's how I'd break it down. Find your column, ignore the other two.

First, the three things that actually determine your answer

Three variables carry most of the weight. First, how many hours a year does the machine actually run—not how many you'd like it to run. Second, how old is the rest of your fleet, because a new grader sitting next to a 12-year-old paver creates its own problems. Third, how much friction is there in your capital approval process, because a machine you can't get approved on time is a machine you don't have.

Get honest numbers on those three and the scenario usually picks itself.

Scenario A: You run a full-time grading and paving crew

If your equipment runs 1,200-plus hours a year and the work is fairly continuous, owning is almost always cheaper than renting, and the math isn't close. Daily rental rates on a motor grader are high enough that past a certain hour count you're paying for the machine twice.

This is the scenario where a Leeboy 695 motor grader makes sense. It's sized for road and lot work without being a machine that only pays for itself on interstate-scale jobs, which matters if your typical project is municipal or commercial rather than highway.

Two things I'd insist on before signing anything. First, ask the dealer for the parts availability list by part number, not a general "we stock parts" assurance. What most people don't realize is that dealer coverage claims are usually about sales territory, not about a stocked shelf, and those are not the same promise. Second, get the service response time in writing—in hours, not "promptly."

On the search side, everyone types leeboy dealer near me and then picks the closest pin on the map. That's backwards. The nearest dealer is a convenience; the dealer with the deepest parts inventory and the best service tech coverage is the one that keeps you running. When I consolidated our vendor list in September 2024, I dropped a supplier 20 minutes closer because their average parts turnaround was 4 days against 36 hours from the one further out. On a machine that's billing out at project rates, that difference paid for itself in the first breakdown.

What you should expect to spend: new graders in this class generally run in the low-to-mid six figures (rough market range as of January 2025; get an actual quote, because configuration, attachment packages, and financing all move the number substantially). Treat that as a budgeting bracket, not a price.

Scenario B: The work is seasonal or project-based

Here's the counterintuitive one. If you're running grading work eight or nine months a year with unpredictable gaps, buying a new grader is usually the worse call—even though every instinct and every trade-show conversation pushes you toward owning.

A machine that sits for three months is still depreciating, still insured, still financed, and still taking up yard space. It's not free when it's parked. I've watched two small contractors buy equipment they loved and then take low-margin work just to keep the hours up, which is a bad spiral.

For this group, the better play is a short-term rental with a purchase option, or a dealer demo arrangement where you run the machine on an actual job before committing. Ask specifically for a demo on your site with your material—not a dealer lot demonstration on graded aggregate, which tells you almost nothing about how the machine behaves in your conditions.

If you're buying used, the smaller Leeboy grader models come up on the secondary market often enough that patience usually pays. But verify the parts situation for that specific model year before you get attached to a listing. A cheap used machine with a discontinued component is not cheap.

Scenario C: You're buying parts, consumables, and site supplies

This is the scenario nobody writes about, and it's the one most companies actually live in week to week.

Our grading foreman, Bob Crane, asked me last spring to order a bench scraper. I had no idea what that was, so I looked it up, because that's my job. What is a bench scraper and how to use it? In a paving context, it's a flat hand tool with a straight or slightly offset edge used for scraping material off flat surfaces—clearing cold asphalt off hopper walls and screed plates, cleaning up around a joint, lifting stuck material off steel. It's not complicated, but the technique matters: you work the edge at a shallow angle and let the flat of the tool do the work instead of digging. The ones with a decent handle grip and a stiff, thick blade hold up far better than the thin stamped versions that bend on the first cold patch.

That was a $30 order. Small. And it's exactly the kind of order where bad suppliers show their colors. I've had vendors quote a 6-unit minimum on a part we needed one of, and I've had a counter rep treat a $200 order like it was an imposition.

My position on this is simple: small orders aren't a nuisance, they're a test. The vendors who treated my $200 orders seriously back in 2020 are the ones I'm still placing $20,000 orders with now. A supplier who can't be bothered with a small first order is telling you something about how they'll behave when you're not their biggest account yet.

The same logic applies to the unglamorous site supplies—sun protection being the one that bites people. Bucket hats for the paving crew sound like a joke line item until it's July, the crew is on fresh asphalt all day, and someone's out for two days with heat exhaustion. We now order them in bulk twice a year with the company logo on them, because a branded hat gets worn and a generic one gets lost. It's a small line in the budget that pays for itself in one avoided incident.

One practical note on small orders: consolidate. A $40 minimum charge plus shipping on four separate orders becomes a $60 loss on the month. We batch supplies into a single weekly order now, and it cut our shipping spend and the number of invoices accounting had to process.

How to figure out which scenario you're in

Answer three questions and stop second-guessing.

One: How many hours did your grader-equivalent machine actually run last year? Not the estimate, the hour meter. Above 1,200 and ownership is usually making you money. Below 800 and it's usually costing you.

Two: How long can your operation survive if the machine is down? If the answer is less than a week, parts availability and service response should outweigh purchase price in every conversation you have. A dealer who saves you $8,000 on the purchase but costs you three days of downtime is not the cheaper dealer.

Three: How does your money approve capital spending? If a major purchase requires a board cycle and a justification memo, a rental arrangement will save you a lot of arguing and possibly a lost project.

I can only speak to our situation—mid-size contractor, mixed municipal and commercial work, reasonably predictable ordering, domestic suppliers only. If you're running highway-scale paving or dealing with cross-border parts logistics, parts of this won't map cleanly onto your reality.

And my sample isn't enormous: this is based on roughly 200 purchase orders and a handful of equipment decisions, not hundreds. Maybe 180 orders, I'd have to pull the system to be sure. But the pattern—buy for hours, rent for gaps, and never judge a supplier by the size of your first order—has held up across every vendor conversation I've had since 2020.

Prices and equipment figures above are for general reference only and reflect market ranges as of January 2025. Actual pricing varies by configuration, dealer, financing terms, and time of order. Verify current quotes and parts availability directly with your dealer before committing.
Share this article:
Charlotte Avery

Charlotte Avery

Charlotte Avery is an earth-moving machinery analyst covering excavators, mini excavators, loaders, skid steers, dozers, graders, compactors, and attachments. She uses ISO 6165 machine classification and ISO 20474-1 safety requirements while examining operating mass, rated payload, breakout force, ground pressure, stability, visibility, guarding, and attachment compatibility. Her work helps contractors and fleet buyers match machine size, undercarriage, transport limits, and protective features to terrain, duty cycle, and jobsite access.

Leave a Reply

Your email address will not be published. Required fields are marked *